Design Technology & Engineering Building
Stowe School - Buckinghamshire
Project & design lead - Design Engine Architects - 2025
Originally, this £6m project was won in a competition in 2016. It was completed this January 2025, officially opening in May 2025. Various site locations and educational arrangements and models were explored.
The building has 3 workshops and a prep room on the lower floor, with 4 design studios above.
Working with Buro Happold, the building aspires to be a case study CLT project, where its method of construction and detail is revealed as an educational tool to the students studying within it. Similarly, services are exposed and colour coded.
A gallery space sits behind a “loggia” elevation, with spectacular views out across the historic estate.